International records / African Development Bank
Contract Award – Nigeria - Agricultural Transformation Agenda Support Program 1 (ATASP-1) : 2B Lot B1
The Works required under this package 2B Lot B1 is summarized below: Construction of 800m Conveyance Pipeline, 2.60Km Main Canal, 16.40km irrigation canal network, 25km field drains, intake structure and various hydraulic structures and 19.55km farm/ service roads.
No file is held for this record yet. The catalogue entry and the link to where it was published are kept.
